Represented the Massachusetts Water Resources Authority (MWRA) on the U.S. $4 billion Boston Harbor Project, which involved over 100 separate design and construction contracts, and during the peak of construction was one of the largest public works projects in the United States. The treatment plant and associated facilities on Deer Island in Boston Harbor provide 61 communities and 2.5 million people with state-of-the-art wastewater treatment with a capacity of over 900 million gallons per day. Construction included new primary and secondary treatment plants, a new headworks, a sludge-to-fertilizer plant, a dedicated power plant, a 5-mile inter-island tunnel and a 9.5 mile effluent outfall tunnel. As a fully integrated member of MWRA’s management team, worked directly with the MWRA’s legal and technical staff on a day-to-day basis to avoid as many problems as possible and to resolve quickly and efficiently those problems that could not be avoided during the construction of a massive tunnel/wastewater project.

Experience Center

Match our Experience to Your Needs

Experience Highlights

Multifaceted debt refinancing transaction for Interface Inc.
Represented Interface Inc., a worldwide leader in the design, production and sales of modular carpet, in its approximately $300 million public debt more
Copyright litigation for the owner of the rights to the famous Dick and Jane reading primer
Represented the owner of the rights to the famous Dick and Jane reading primer, a Pearson Education subsidiary, in trademark and copyright litigation more
Successful settlement of UST release-related claims against major oil company
Represented a major oil company in resolving threatened litigation arising from a UST release. Case was settled without litigation for less than 20 more
Counsel to pipeline company in manufacturing specialized products
Represented pipeline company, as lead counsel, in the design, manufacture and procurement of $5 million worth of specialized products. more